🏗️ EPC PILOT — 5 places remaining

Protection engineering. Rethought from scratch.

GridSense brings professional-grade power systems calculations to your browser — IEC 60909 fault analysis, IEEE 1584 arc flash, TCC coordination, and PDF reports. No desktop install. No large upfront licence.

Apply for EPC Pilot — 60 Days Free
5 EPC firms · Full Professional access · No credit card · 60-day trial
Already have access? Sign in →
21kA
Fault current calc
IEC 60909
Standard compliant
210+
Verified test cases
₹2,499
Per user / month
app.gridsense.io/dashboard/project-001
Isc 3-phase
21.66 kA
415V MDB busbar
Peak Current
40.67 kA
IEC 60909 κ=1.88
Max Arc Flash
0.04 cal/cm²
PPE Category 0
Coordination
0/3
⚠ Miscoordinated
TCC — Time Current Characteristics
MAIN 630A SUB 250A FINAL 100A Isc
Device Health
MAIN
4%
SUB
14%
FINAL
28%
THERMAL
100%
⚠ MAIN thermal capacity at limit
IEC 60909 Short-Circuit
IEEE 1584 Arc Flash
IEC 60255 TCC Coordination
ANSI 50/51 Overcurrent
COMTRADE Export
Contact Wear Monitoring
IEC 61439 Panel Verification
Thermal Modelling
PDF Report Generation
IEC 60909 Short-Circuit
IEEE 1584 Arc Flash
IEC 60255 TCC Coordination
ANSI 50/51 Overcurrent
COMTRADE Export
Contact Wear Monitoring
IEC 61439 Panel Verification
Thermal Modelling
PDF Report Generation

Protection software is
stuck in 2005

The tools haven't changed. The prices have only gone up. There's a better way.

01
Enterprise-only pricing
Existing power systems software is priced for utilities with massive capex budgets. Independent consultants, panel builders, and small firms are priced out entirely.
02
Installed desktop software
Single-machine licences. No collaboration. No version history. A site visit means a laptop. Sharing a project means emailing proprietary file formats nobody else can open.
03
Black-box calculations
You get a number. You don't always know exactly which clause of which standard produced it. When a client questions the result, you're back to first principles with a spreadsheet.

Every calculation.
Every standard.
One platform.

From initial fault level study to final arc flash label — GridSense covers the full protection engineering workflow, backed by verified physics and cited standards.

⚡
IEC 60909 Short-Circuit
3-phase, 1-phase, and peak fault currents from nameplate data alone. Transformer Zk%, cable impedance, utility fault MVA — every result cites the exact IEC 60909 clause.
IEC 60909
🔥
IEEE 1584 Arc Flash
Incident energy (cal/cm²), arc flash boundary, and PPE category 1–4 at every bus. Print-ready labels and a dated audit trail ready for the AHJ.
IEEE 1584-2018
📈
TCC Relay Coordination
Interactive log-log TCC canvas — drag device curves, see mis-coordinations flagged instantly, check CTI ≥ 0.3 s across every device pair, and export to your PDF coordination report.
IEC 60255
⚙️
Motor Coordination Type 1 & 2
Verifies your SCPD clears before the contactor welds at the actual prospective fault current. Type 1 and Type 2 per IEC 60947-4-1 and UL 508A.
IEC 60947-4-1
🎯
Distance Protection Zones
Zone 1/2/3 reaches on an interactive R-X impedance diagram with load impedance, load encroachment limits, and pilot scheme infeed correction per IEC 60255-121.
IEC 60255-121
🔀
Transformer Differential
Biased differential with vector group correction, dual-slope bias characteristic, and 2nd harmonic inrush restraint — simulates in-zone faults vs magnetising inrush.
IEC 60255
🛡️
IED Protection Relay Settings
ANSI 50/51/67/21/27/59/81/87 full function set with zone-selective interlocking, directional overcurrent, and differential. COMTRADE export for FAT sign-off.
ANSI C37
📊
Load Flow Analysis
Newton-Raphson and Gauss-Seidel solvers — per-bus voltage magnitude, angle, line flows, and losses on any topology. Convergence verified in 3–5 iterations.
IEC 60038
〰️
Harmonic Analysis
THDi and THDv for VFDs, UPS, and EV chargers — compared against IEC 61000-3-2 and -3-4 limits by Rsce category, with resonance frequency identification.
IEC 61000-3-2
🔋
Power Factor Correction
kVAr compensation from tan φ difference, standard step sizes suggested, and resonance frequency checked against harmonic sources before you install the capacitor bank.
IEC 60364
📉
Power Quality Assessment
Voltage unbalance, flicker (Pst), sags, THDv, and frequency deviation checked against EN 50160 and IEC 61000-4 — voltage sags plotted on the ITIC/CBEMA curve.
EN 50160
🔌
Overhead Line Rating
Conductor thermal rating with solar radiation, wind cooling, and ambient temperature per IEC 61597 — static and dynamic line rating with sag and clearance calculation.
IEC 61597
📋
Load Estimation
Connected load, demand factor, diversity factor, and 20-year growth projection rolled up per feeder and transformer — load schedule output ready for single-line annotation.
Demand Factor
🔁
Frequency Response & UFLS
Frequency nadir and ROCOF for any loss-of-generation event. UFLS stage validation — threshold frequency, delay, and MW shed per step — against grid code limits.
IEC 60034
⚙️
AVR & PSS Design
ST1A, DC1A, and AC1A excitation system models per IEEE 421.5 with Bode plot, gain/phase margins, and PSS1A washout filter tuning at inter-area oscillation frequency.
IEEE 421.5
🔌
Cable Sizing — IEC / BS / IS
Current-carrying capacity with derating for temperature, grouping, and installation method per IEC 60364-5-52. Voltage drop and thermal withstand checks included.
IEC 60364
🔌
Cable Sizing — NEC (NFPA 70)
NEC Table 310.15(B)(16) ampacity with temperature and conduit fill correction factors. AWG/kcmil selection with voltage drop in feet at 3% NEC recommendation.
NFPA 70 NEC
📏
Busbar Sizing
Thermal cross-section per IEC (A ≥ Ik√tk/k) and electromagnetic force between phases per IEC 60865. Support span verified against beam bending stress.
IEC 60865
🔧
Transformer Sizing
Demand factor, diversity, future growth, altitude, and ambient temperature derating per IEC 60076. Next standard kVA rating selected above — loading percentage shown.
IEC 60076
🏭
Generator Sizing
Running kVA from all loads plus the peak starting kVA from the largest motor started last — ISO 8528 rated at 0.8 PF with selected kVA covering both conditions.
ISO 8528
🔄
Motor Starting Analysis
DOL, star-delta, autotransformer, soft-starter, and VFD starting compared — voltage dip at PCC, accelerating torque vs load torque, and starting time for each method.
IEC 60034
📡
VFD Sizing
Output current for ND/HD duty cycle, braking resistor sizing for regenerative loads, and input harmonic current spectrum (6-pulse / 12-pulse / active front end).
IEC 61800
🔃
Soft Starter Sizing
Current ramp vs torque ramp mode comparison, thermal capacity per start, and starts-per-hour limit — verifies the SCR handles the application class A or B duty.
IEC 60947-4-2
☀️
Solar PV System Sizing
String configuration, inverter sizing (DC/AC ratio 1.0–1.3), DC protection, and AC connection sizing — all checked against IEC 62446 and NEC Article 690.
IEC 62446
🔋
BESS Sizing
Required kWh from load profile and backup duration, C-rate check, round-trip efficiency, and degradation model — capacity at years 1, 5, 10, and end-of-life.
IEC 62619
🌍
Earthing System Design
Touch and step potential per IEEE 80 — grid conductor sizing, mesh and step voltages, and tolerable body current limit calculated for the fault clearing time.
IEEE 80
🌊
Transient Stability & CCT
Time-domain swing equation simulation for multi-machine networks. Critical clearing time quantified by bisection — rotor angle and speed deviation plots for the stability report.
IEEE 1110
📉
Voltage Stability
Continuation power flow P-V and Q-V nose curves — voltage collapse point, maximum loadability margin, and weakest bus identification for reactive support sizing.
CPF / P-V
〰️
Small-Signal Stability
Eigenvalue analysis of the linearised multi-machine state-space — damping ratio, participation factor, and mode shape for every oscillation mode. Inter-area vs local classification.
Modal Analysis
📊
DC Optimal Power Flow
DC-OPF with linear cost curves, bus injection limits, and line thermal constraints — LMPs at each bus and shadow prices on congested lines in under 10 seconds.
DC-OPF
🗓️
Unit Commitment & Dispatch
24-hour MILP schedule with startup/shutdown costs, ramp limits, and spinning reserve. HiGHS solver — optimal solution typically in under 30 s for 10-unit systems.
MILP / HiGHS
⚡
Device Health Monitoring
Contact wear and cumulative I²t tracked for MCCBs and ACBs. Remaining useful life estimated from trip and fault current history — maintenance priority ranked.
Predictive
🔮
Digital Twin
Weighted Least Squares state estimation fuses SCADA meter readings — bad data detection and identification — to produce a fully observable network state in real time.
WLS / Real-time
🔬
pandapower Engine
Validated NR and IEC 60909 SC studies tested against IEEE 9, 14, 30, 118-bus and CIGRE MV/LV benchmarks — V&V results shown alongside every calculation.
Open-source
⚡
OpenDSS Engine
Three-phase unbalanced distribution networks with DER dispatch, EV loads, and unbalanced phases — time-series quasi-static and harmonic penetration on any feeder topology.
EPRI / IEEE
📦
NEC Conduit & Box Fill
NEC Chapter 9 Table 1 fill percentage for any conductor mix in EMT, IMC, RMC, or PVC. Box fill per Article 314 — flags overfill before the installation begins.
NFPA 70 Art 314
🏷️
NEMA Motor Frame & Enclosure
NEMA MG-1 frame number from HP, RPM, and service factor. Enclosure type matched to NEC area classification — ODP, TEFC, TENV, TEAO, or explosion-proof.
NEMA MG-1
🔒
ANSI C37 Switchgear Ratings
Symmetrical and asymmetrical interrupting ratings checked against calculated fault current. S-factor applied for older C37.06 equipment. Momentary rating vs peak ip.
ANSI C37
🌐
NEC Art. 250 Grounding
EGC from NEC Table 250.122, GEC from Table 250.66, and main bonding jumper (12.5% of largest service entrance conductor) — all cited with the exact NEC article.
NFPA 70 Art 250
📐
ANSI C84.1 Voltage Levels
Nominal, maximum, and minimum voltage at each bus cross-checked against ANSI C84.1 Range A (±5%) and Range B limits — flags buses in violation so you can upsize a tap.
ANSI C84.1
✏️
IEC 60617 SLD Editor
Drag-and-drop IEC 60617 symbols, wire them with a click, and produce a standards-compliant one-line diagram before the site walkthrough ends — desktop and tablet.
IEC 60617
🗂️
Multi-diagram Tabs
Multiple diagram tabs inside one project — switch between your 132 kV, 33 kV, and 11 kV networks without losing your place on any of them.
Multi-voltage
📦
Component Templates
Save any component group as a named template and drop it into any diagram — consistent symbols, consistent parameters, every time across all your projects.
Reusable
📄
PDF Report Generation
One-line diagram, TCC curves, arc flash labels, and fault study assembled into a stamped PDF — ready to submit to clients and the AHJ in one click.
Client-ready
🏷️
White-label Reports
Upload your logo and set your brand colour once — every PDF GridSense generates carries your firm's name and registration number with no GridSense watermark.
Branded
🔗
Shared Diagram Viewer
One-click share link generates a public read-only viewer instantly — your client, contractor, or AHJ views the one-line on any device without a GridSense account.
No login needed
🕐
Version History
Every save creates a timestamped snapshot you can browse and restore. A complete audit trail from first diagram to final issue — with who made each change.
Audit trail
👥
Team & Org Accounts
Invite by email, assign owner / admin / member / viewer roles — no IT involvement. Org projects visible to all members with appropriate access level.
Role-based
🎓
Onboarding Tour
Guided tour walks you through drawing a one-line, running a fault study, and generating a report — the full workflow in about 10 minutes, in-place context tips.
10 min
🔑
Public REST API
Every project, calculation, and diagram accessible via a documented REST API — create projects, save networks, retrieve fault results, build GridSense into your tools.
OpenAPI
🔔
Webhooks
Subscribe to project.created, network.saved, diagram.shared, and calculation.completed events — every POST signed with HMAC-SHA256. Delivery history and retry log in the Dev panel.
HMAC-SHA256
📱
Mobile & Tablet Ready
Pinch-zoom and pan the SLD canvas, check arc flash labels at the panel, review TCC curves on-site — full interface on any touch device, no app download required.
Responsive
🎛️
Tiered Access
Starter, Core, Professional, and Grid Studies tiers — upgrade or add seats at any time. Full platform + API + webhooks + team accounts on Grid Studies.
Starter → Grid Studies

From nameplate to
report in minutes

1
Enter or upload device data
Type in nameplate values or upload a CSV. GridSense parses transformer ratings, cable sizes, and MCCB settings automatically.
2
Run the calculations
IEC 60909 fault levels, TCC grading, and IEEE 1584 arc flash all run in under 2 seconds. Fully transparent — every formula shown.
3
Review and optimise
Interactive TCC chart shows miscoordinations instantly. Adjust TMS and delay settings live and see the effect in real time.
4
Export and deliver
Download a PDF report, export COMTRADE files for relay testing, or share a live link with your client — no account needed on their end.
IEC 60909
Short-circuit currents
IEC 60255
Measuring relays
IEEE 1584
Arc flash hazard
IEC 60947
LV switchgear
ANSI C37
Protection relays
IEC 61850
Substation comms
IEC 61439
LV assemblies
IEC 60364
Electrical installations
IEEE 421.5
Excitation systems
ANSI 21
Distance protection

60-day pilot.
Affordable after.

EPC firms get full Professional access free for 60 days. Paid plans activate after the trial — less than one day of engineering time per month.

Core
₹ 6,999
per user / month
For individual engineers and small consultancies running protection and fault studies.
  • 10 active projects
  • IEC 60909 fault analysis
  • IEEE 1584 arc flash (2018)
  • IEC 60255 relay coordination
  • Cable & busbar sizing
  • Stamped PDF report export
  • Email support
Start free trial
POWER USERS
Grid Studies
₹ 42,999
per user / month
For grid operators, IPPs, and DISCOMs running large-scale network studies.
  • Everything in Professional
  • pandapower & OpenDSS engines
  • Distance protection (IEC 60255)
  • AVR / PSS tuning (IEEE 421.5)
  • DC-OPF & unit commitment
  • Team & org management
  • Full API + Webhooks
  • Dedicated account manager
Start free trial

Enterprise — DISCOMs · large IPPs · PSUs · white-label OEM · from ₹15L/year · Contact sales →  ·  Annual billing saves up to 18%. See full plan comparison →

Why EPC firms are
joining the pilot

5 EPC firms · 60-day free trial · Full Professional access. Tell us what works, what breaks, and what to build next.

⏱️
"Relay coordination studies take 2 full days with our current tools. I want to see if this can change that."
— Reason cited by protection engineers on the waitlist
💷
"Enterprise power systems licences are completely out of reach for independent consultants and small firms."
— Reason cited by independent chartered engineers on the waitlist
📄
"I need calculation reports that cite the exact IEC/IEEE clause — for PI insurance and client sign-off."
— Reason cited by panel builders and consultancies on the waitlist

EPC pilot participant? Your real-world feedback shapes every release.
Share what works, what breaks, and what we're missing — reply to your onboarding email or hit the Feedback button in-app.

🏗️ EPC Pilot Programme

60 days free.
No credit card.

We're onboarding 5 EPC firms for a 60-day pilot — full Professional access at no cost. Run real project studies, validate the calculations against your existing tools, and tell us what to build next.

Apply for EPC Pilot Contact us →

60-day free trial · Full Professional features · No credit card · 5 pilot places remaining